Video Banner

Van Systems

Steel Construction. Simplicity, Reliability.

Product Image
Built by Pure Freedom

Over 20 years experience in fabrication, our products have gained a reputation for being robust & reliable. All of our equipment is machined in the UK, by time served engineers, on site at our Grimsby Engineering Workshops.

Product Image
Easy Access to Components

Pure Freedom systems allow easy access to all key components, including filters, without the need to remove covers or containers, for hassle-free maintenance and quick adjustments when needed.

Product Image
Welded Framework

The welded framework provides superior strength, stability, and long-lasting durability. Built to withstand heavy use and tough conditions for reliable performance on every job.

Specifications
CapacityHeightWidthDepthAvailable Filtration
Flat 350L
534.20mm
1110.50mm
1035.78mm
Delivery / DI / RO & DI
Flat 500L
623.20mm
1206.03mm
1116.50mm
Delivery / DI
Flat 650L
545.00mm
1286.03mm
1355.50mm
Delivery / DI / RO & DI
Flat 800L
698.20mm
1376.28mm
1360.50mm
Delivery / DI / RO & DI
Upright 500L
982.50mm
914.03mm
1105.50mm
Delivery / DI / RO & DI
Upright 650L
1008.20mm
856.03mm
1360.50mm
Delivery / DI / RO & DI
Upright 800L
1091.20mm
984.53mm
1360.50mm
Delivery / DI / RO & DI
Installation

Most of our van mounted systems can be installed within 8 hours at any of our installation points

Pure Freedom

Unit 4, Estate Road 3, Grimsby DN31 2FH

+44 333 1234 365

Window Cleaning Warehouse Barry

Unit 3 A2B, Atlantic Trading Estate, Barry CF63 3RF

+44 14467 49060

Billericay Cleaning & Supplies

Unit M, The Enterprise Centre, Paycocke Rd, Basildon SS14 3DY

+44 1268 536191

Window Cleaning Warehouse Liverpool

1, Brookfield Trade Centre, 132 Brookfield Dr, Fazakerley, Liverpool L9 7AJ

+44 1446 749060

FAQs

Most installations are completed within 1 day, but this can vary depending on the selected system/additions. 
We offer professional installation at multiple sites throughout the UK: South Wales, Liverpool, Billericay, Grimsby
2 years excluding battery & consumables. “Back to base” conditional warranty against manufacturing defects.
ALL SYSTEMS; Tank Cage Required Backplate(s) & Tray(s) Pump(s) *1 or 2 depending on 1 man or 2 man system* Controller(s) *As above* Batteries Hoses Fittings. DI SYSTEMS; As above + FIlled DI Vessel(s) Clamps Hoses Fittings FULL RO SYSTEMS; Filters & Housings Membrane & Housing Pressure Gauge Clamps Hoses Fittings OPTIONAL EXTRAS *Not included as standard* Sterling Split Load Charger (Smart Battery Charging System) CTEK Charger (Smart Battery Charging System) Pole Racks/Holders Reels Van Ports Roller Guides Hot System Inline TDS Booster Pump
We would expect a boosted system to produce approximately 250-300 litres of pure water per hour. A non boosted system can vary depending on water supply.